This project involves the removal and replacement of the building’s existing balcony cladding, installation of a new gutter system, and repainting the exterior block, plaster, aluminium garage doors, timber pergola and exterior steel beams in accordance with Resene’s specifications. The building comprises four apartments each on its own level, plus occupant garaging on the ground floor.

Key challenges during this seven-week programme include working within a live environment as residents will remain on site, and access logistics due to the tight, sloping site—due to the limited workspace there are no lay down areas for materials or site waste storage. The team is also mindful of the possibility of discovering rotten timber and asbestos within the existing structure.

Works will begin with the installation of a scaffold suspended from the balcony of Level 1, which will ensure residents have unobstructed access the ground floor garage throughout the project. The face scaffold will then be installed up to Level 5. This will allow the demolition team to remove existing tiles while the scaffold progresses to the side elevations which are situated on a steep embankment.

Upon removal of the existing balcony claddings, an investigation will take place on the substructure to ensure there is no current water damage. If found, new details will be required to ensure the installation of a “like for like or better” system in order to prevent any future reoccurrences of the issue.

PROJECT

137 Tamaki Drive

TYPE

Residential

CLIENT

Apartment Owners

LOCATION

Mission Bay, Auckland

STARTED

January, 2019

COMPLETED

March, 2019

BUDGET

$261,300

Other Projects

Winemaker's House

Winemaker's House

What can sometimes seem to be a straightforward residential build can prove to be more complex once adverse weather, difficult site access and a design involving a number of detailing challenges are taken into account.

Read More

Woodend School

Woodend School

Brosnan Construction were awarded the contract to construct an 800 square metres 2 storey redevelopment in the growing North Canterbury township of Woodend. The scope for Woodend School included a new two storey eight classroom block. In addition to this, there are some minor weather-tightness repairs for the three remaining buildings. At the completion of the project, the demolition of a two classroom cebus unit will be completed.

Read More

University of Canterbury Locke & Logie Buildings

University of Canterbury Locke & Logie Buildings

Brosnan was engaged to complete the refurbishment of the Locke and Logie Buildings on University Drive based on the recent successful delivery of the University’s K1 Lecture Theatre (Stages 1 & 2) and the Sports Department (Stage 3).

Read More

Devonport Navy Museum Extension

Devonport Navy Museum Extension

This project was commissioned to celebrate the centenary of WW1 and Brosnan Construction was proud to be involved in work that would be a feature of the commemoration celebrations. The project involved a single level extension to the existing Navy Museum, together with a refurbishment of the historic carpenters’ workshop excavated into the cliff at North Head,

Read More