This project involves the removal and replacement of the building’s existing balcony cladding, installation of a new gutter system, and repainting the exterior block, plaster, aluminium garage doors, timber pergola and exterior steel beams in accordance with Resene’s specifications. The building comprises four apartments each on its own level, plus occupant garaging on the ground floor.

Key challenges during this seven-week programme include working within a live environment as residents will remain on site, and access logistics due to the tight, sloping site—due to the limited workspace there are no lay down areas for materials or site waste storage. The team is also mindful of the possibility of discovering rotten timber and asbestos within the existing structure.

Works will begin with the installation of a scaffold suspended from the balcony of Level 1, which will ensure residents have unobstructed access the ground floor garage throughout the project. The face scaffold will then be installed up to Level 5. This will allow the demolition team to remove existing tiles while the scaffold progresses to the side elevations which are situated on a steep embankment.

Upon removal of the existing balcony claddings, an investigation will take place on the substructure to ensure there is no current water damage. If found, new details will be required to ensure the installation of a “like for like or better” system in order to prevent any future reoccurrences of the issue.

PROJECT

137 Tamaki Drive

TYPE

Residential

CLIENT

Apartment Owners

LOCATION

Mission Bay, Auckland

STARTED

January, 2019

COMPLETED

March, 2019

BUDGET

$261,300

Other Projects

Glenside Terraces Apartments

Glenside Terraces Apartments

The Glenside Terraces project involved the rebuild of 33, 2 and 3 storey urban townhouse units, as well as construction of ground retail spaces to the 3 storey dwellings accessible from Symonds Street.

Read More

North Shore Hospital Building 5

North Shore Hospital Building 5

North Shore Hospital Building 5 was constructed in the 1960’s for the purpose of being occupied as staff accommodation. The structure of the building consists of an inadequately filled concrete masonry reinforced exterior cladding with a hollow clay block used as formwork for the 70mm concrete floors. The 2nd story resides of a mix of internal concrete brace walls and structural timber holding the light weight roof. The new purpose of the building is to create a hospital outpatients ward on level zero and offices and teaching facilities on level one and two.

Read More

University of Canterbury Locke & Logie Buildings

University of Canterbury Locke & Logie Buildings

Brosnan was engaged to complete the refurbishment of the Locke and Logie Buildings on University Drive based on the recent successful delivery of the University’s K1 Lecture Theatre (Stages 1 & 2) and the Sports Department (Stage 3).

Read More

NZMA Carbine Road, Mt Wellington - Stage 1 & 2

NZMA Carbine Road, Mt Wellington - Stage 1 & 2

Starting with a large, empty warehouse, the need to convert it to a state-of-the-art hospitality training facility and a very tight timeline placed the Brosnan team under significant pressure to deliver. The fact the finished product also went on to win an Award is just one indication of the successful outcome of the project.

Read More