Brosnan successfully negotiated the construction of the 14,000 square metre industrial offices and warehouse on Roscommon Road, Wiri and was appointed the project by the Hugh Green Group.

Part of this project included Brosnan managing the design and build of the warehouse’s post-tension floor. The post-tension floor was one of the most important aspects of this project and as a multiple stakeholder project, working with potential tenants as well as our client, it was important for Brosnan to gain a solid understanding of the requirements specific to each party and to provide a solution that would effectively meet the needs of all involved.

During the construction process, an international tenant (Jamestrong Packaging) was secured by HGL and Brosnan was required to manage some significant and complex changes to the project scope. 

This involved preparing budget estimates and programs for the proposed changes from concept drawings and design briefs. We also provided expert advice on material selection, construction details and what the design team needed to focus on in order to minimise the impact of the proposed changes on the completion due date.

We are proud that our strong ability to navigate challenges and offer flexible solutions has met the evolved requirements of the client and tenants and has kept this major project on-track for a timely completion.

PROJECT

Roscommon Road, Wiri

TYPE

Commercial,Industrial

CLIENT

Hugh Green Group

LOCATION

Wiri

STARTED

October, 2017

COMPLETED

January, 2019

BUDGET

$17,200,000

Other Projects

Takapuna Grammar School, Block N Refurbishment

Takapuna Grammar School, Block N Refurbishment

Projects at educational premises will tend to involve strict workarounds to enable the school to continue to deliver for its pupils during the construction phase or, alternatively, very short timeframes for completion when working during holiday periods. This project had both.

Read More

Jacks Point House

Jacks Point House

An owner-designed home, built in an area of outstanding natural beauty, but needing to commence construction in late Autumn, meant that this was no straightforward build...

Read More

North Shore Hospital Building 5

North Shore Hospital Building 5

North Shore Hospital Building 5 was constructed in the 1960’s for the purpose of being occupied as staff accommodation. The structure of the building consists of an inadequately filled concrete masonry reinforced exterior cladding with a hollow clay block used as formwork for the 70mm concrete floors. The 2nd story resides of a mix of internal concrete brace walls and structural timber holding the light weight roof. The new purpose of the building is to create a hospital outpatients ward on level zero and offices and teaching facilities on level one and two.

Read More

MoJ Justice Precinct

MoJ Justice Precinct

The $320m Christchurch Justice & Emergency Services Precinct is an anchor project, of the Christchurch rebuild led by the Ministry of Justice The precinct is located on the block defined by Lichfield, Colombo, Tuam and Durham Streets encompasses approximately 40,000 square metres of floor space over five floors.

Read More