Projects

What We Do

MoJ Justice Precinct

Brosnan Construction were engaged Fletcher Construction to construct the partitions and installation of secondary steelwork to the ground floor area. The precinct has been designed and constructed using an advanced approach to seismic design, with base isolation and built to an Importance level 4 standard. The ground floor area incorporates some of the most technically challenging aspects in the building. Namely around maintaining strict clearances around the buildings base isolators and numerous stairwells and liftshafts. Given the fluid and cutting edge nature of the design being employed, day to day coordination with the design team has been embraced by the Brosnan team who have made their mark on a truly landmark project.

Given the fluid and cutting edge nature of the design being employed, day to day coordination with the design team has been embraced by the Brosnan team who have made their mark on a truly landmark project. Faced with a continually evolving design, the Brosnan team displayed an unfailing adaptability to deliver a quality finish in what was a challenging project.

 

PROJECT

MoJ Justice Precinct

TYPE

Commercial,Civic

CLIENT

Fletcher Construction

LOCATION

Central Christchurch

STARTED

April, 2016

COMPLETED

May, 2017

BUDGET

$6,200,000

Other Projects

University of Canterbury Locke & Logie Buildings

University of Canterbury Locke & Logie Buildings

Brosnan was engaged to complete the refurbishment of the Locke and Logie Buildings on University Drive based on the recent successful delivery of the University’s K1 Lecture Theatre (Stages 1 & 2) and the Sports Department (Stage 3).

Read More

North Shore Hospital Building 5

North Shore Hospital Building 5

North Shore Hospital Building 5 was constructed in the 1960’s for the purpose of being occupied as staff accommodation. The structure of the building consists of an inadequately filled concrete masonry reinforced exterior cladding with a hollow clay block used as formwork for the 70mm concrete floors. The 2nd story resides of a mix of internal concrete brace walls and structural timber holding the light weight roof. The new purpose of the building is to create a hospital outpatients ward on level zero and offices and teaching facilities on level one and two.

Read More

Babbage Office Fitout

Babbage Office Fitout

Being awarded this work, to complete the office fit-out for a leading firm of architects, has its own inherent challenges around total quality of fit and finish. Add-in the use of high-specification materials and finishes means a true test of our attention to detail.

Read More

Summerset Karaka Module 103 and 104 Care Apartments

Summerset Karaka Module 103 and 104 Care Apartments

The Summeret Karaka complex is a rapidly growing contemporary retirement village in a quiet country setting in South Auckland. It features a new village centre made up of villas, townhouses and apartments.

Read More