The Waitakere Maternity unit required an upgrade to patient services and Brosnan Construction was contracted to complete a scope of work that included the refurbishment and upgrade of the bathroom facilities in the birthing suites, reconfigurations to the public and family areas, construction of additional ensuites and external improvements to provide a covered ambulance bay.

The project involved working in a live hospital environment with access permitted to small sections of the ward at any given time.

It was critical that the hospital could continue to provide the vital community services with minimal disruption. Brosnan was instrumental in reviewing the methodology and in conjunction with the project team came up with a number of far less disruptive solutions.

 Furthermore, public safety had to be strictly controlled and monitored at all times. A full height, clean wall hoarding system was used to confine the workers within the site and to maintain a privacy screen for the sensitive areas of the ward. The hoarding was further modified to assist with acoustic and dust controls.

Brosnan’s site team coordinated daily with the ward managers to communicate and plan for specific disruptive activities, service outages and transition during the staged handovers.

As with any existing building, challenges were not confined to the new works. Brosnan Construction provided as much early warning of the issues discovered to allow sufficient design time to avoid delays.

The project was a very challenging environment and, although the environment and the challenges were complex, the completion date was achieved.

PROJECT

Waitakere Hospital Maternity Ward Refurbishment

TYPE

Healthcare

CLIENT

Waitamata District Health Board

LOCATION

Henderson, Auckland

STARTED

February, 2015

COMPLETED

June, 2015

BUDGET

$923,000

Other Projects

137 Tamaki Drive

137 Tamaki Drive

This project involves the removal and replacement of the building’s existing balcony cladding, installation of a new gutter system, and repainting the exterior block, plaster, aluminium garage doors, timber pergola and exterior steel beams in accordance with Resene’s specifications. The building comprises four apartments each on its own level, plus occupant garaging on the ground floor.

Read More

Padfield Building Sensory Unit

Padfield Building Sensory Unit

PFR's sensory science unit is an internationally recognised research department that tests both expert and public consumer responses to food and beverage. The scope of this project covered the refurbishing and fit out of L1 of the Padfield Building located at OFR's Mt Albert campus. This included the demolition of existing open plan working areas, offices and some laboratories, and the construction of a new sensory unit and office space. Included in the works is a kitchen area for consumer food preparation, sensory booths, open plan office with meeting rooms and toilet facilities in an area of approximately 700m2.

Read More

Takapuna Grammar School, Block N Refurbishment

Takapuna Grammar School, Block N Refurbishment

Projects at educational premises will tend to involve strict workarounds to enable the school to continue to deliver for its pupils during the construction phase or, alternatively, very short timeframes for completion when working during holiday periods. This project had both.

Read More

Roscommon Road, Wiri

Roscommon Road, Wiri

Brosnan successfully negotiated the construction of the 14,000 square metre industrial offices and warehouse on Roscommon Road, Wiri and was appointed the project by the Hugh Green Group.

Read More