Kidicorp - New Build Child Care Centre

The creation of a new Kidicorp Child Care Centre included the demolition of the existing dwellings and construction of a 505m2 single storey building with additional covered and outdoor play areas.
The development is within a residential zone and resource consent requirements included comprehensive acoustic fencing, planting and car parking for 22 cars.

The client’s brief was the building had to be operational for the new school year – irrespective of initial building consent delays; this included the client’s fit out and final sign off from both the Ministry of Education and Ministry of Health.

Being in the midst of a residential zone working hours were restricted limiting the options to accelerate. Brosnan committed to working through the Christmas break in an effort to keep the project moving and to bring the project to a timely conclusion.

Problem-solving in advance was a fundamental aspect to the successful timing of the handover. Our team undertook an extensive review of the construction details in advance to keep ahead of the construction sequence. By foreseeing and resolving issues in advance momentum was maintained and down-time was keep to the absolute minimum.

The centre was opened as originally intended with full compliance.

PROJECT

Kidicorp - New Build Child Care Centre

TYPE

Education

CLIENT

Horizon Resources Limited

LOCATION

Auckland

STARTED

September, 2014

COMPLETED

December, 2014

BUDGET

$1,230,000

Other Projects

Summerset Karaka Module 103 and 104 Care Apartments

Summerset Karaka Module 103 and 104 Care Apartments

The Summeret Karaka complex is a rapidly growing contemporary retirement village in a quiet country setting in South Auckland. It features a new village centre made up of villas, townhouses and apartments.

Read More

The Sails Building

The Sails Building

The earthquakes of 2010 and 2011 left many buildings in Christchurch damaged. Some have had to be demolished, but for The Sails Building on Ferry Road, Brosnan Construction undertook structural repairs and upgrades, through to interior fit-out.

Read More

McTiegues Road Stage 5

McTiegues Road Stage 5

The key to this project was the way in which Brosnan Construction worked with their associated trades and supply chain during a short timescale to ensure delivery of this phase of the construction.

Read More

Mt Isthmus Lodge

Mt Isthmus Lodge

Brosnan was re-engaged by the client to deliver this upmarket lodge on the edge of Lake Hawea following the successful completion of the ‘The Lindis’, a luxury lodge in the Ahuriri Valley.

Read More