Te Kura Kaupapa Maori o Waitaha

Brosnan Construction was awarded this remediation project involving the removal of all cladding, treatment of the existing timber and replacement as required, insulation upgrades and cladding replacement, interior upgrades of the fire protection system and architectural finishes, drainage replacement and paved surface treatments.

Delivery of the completed project on time was critical to the ongoing Ministry of Education development programme.  The School also needed to vacate their temporary school facilities to allow another school access, meaning we could not miss the deadline date.

Further challenges involved planning around the delivery of consent exemption approvals, revised detailing taking into account the existing conditions and construction issue drawings so the site team could proceed with certainty. This placed additional emphasis on regular communication with all stakeholders so that critical decisions were made in a timely manner.

The site team delivered an outstanding result under difficult circumstances.

PROJECT

Te Kura Kaupapa Maori o Waitaha

TYPE

Education

CLIENT

Ministry of Education

LOCATION

Christchurch

STARTED

September, 2014

COMPLETED

April, 2015

BUDGET

$1,600,000

Other Projects

Mon Desir Apartments

Mon Desir Apartments

The ‘leaky home’ issues in New Zealand construction have caused numerous problems for both homeowners and the industry alike. This project typified that situation, with a set of anxious, largely elderly, owners and an initial contractor that went into liquidation during phase one of the project. It was against this backdrop that Brosnan Construction were engaged to complete the contract.

Read More

Tamaki Primary New Classrooms and Special Needs Satellite Unit

Tamaki Primary New Classrooms and Special Needs Satellite Unit

The ever-growing population of New Zealand means that our educational facilities are under constant review as the student roll also continues to grow. Add to that the requirement to cater for students with special needs and you have a project brief which is far from straightforward, including three additional classrooms and a special needs satellite unit, with related ancillary spaces.

Read More

Babbage Office Fitout

Babbage Office Fitout

Being awarded this work, to complete the office fit-out for a leading firm of architects, has its own inherent challenges around total quality of fit and finish. Add-in the use of high-specification materials and finishes means a true test of our attention to detail.

Read More

Devonport Navy Museum Extension

Devonport Navy Museum Extension

This project was commissioned to celebrate the centenary of WW1 and Brosnan Construction was proud to be involved in work that would be a feature of the commemoration celebrations. The project involved a single level extension to the existing Navy Museum, together with a refurbishment of the historic carpenters’ workshop excavated into the cliff at North Head,

Read More