Vingoe Trust Building Reclad

Brosnan Construction was engaged to complete the earthquake repairs on this highly sensitive building while it remained fully operational. We worked very closely with the Insurers representatives, property owner, tenant, design team and our specialist subcontractors to achieve the best possible results. This included high levels of planning, communication and teamwork to ensure the project was completed to the satisfaction of all stakeholders.

The majority of the building facade was an insulated plaster system that needed to be removed to allow the structural cracking to be identified and repaired before the plastering system was reinstated. This involved fully encapsulating the building envelope to ensure the lightweight plaster system did not escape into the environment, the use of extensive personal protective equipment and permitted work fronts to minimise the impact on the building users.

Detailed Health and Safety and Environmental planning were critical to the success of this project due to the risks involved with the building operations, demolition requirements, working within the sealed roof space controlling approved product fumes, dust and heat risks. Due to the extremely sensitive equipment within the building all products had to undergo testing and approval before they could be used within the clean environment.

Weather tightness improvements to the replacement feature façade included the introduction of James Hardie’s Stira system to give the façade a modern appearance.

PROJECT

Vingoe Trust Building Reclad

TYPE

Industrial

CLIENT

Vingoe Trust Ltd

LOCATION

Christchurch

STARTED

August, 2014

COMPLETED

February, 2015

BUDGET

$1,000,000

Other Projects

Matakauri Lodge Owners Cottage

Matakauri Lodge Owners Cottage

The construction of a 4-bedroom cottage to 6-star standards was both a privilege and a challenge. No effort was spared to ensure the finished product lived up to the high standards expected of Matakauri Lodge and its sister properties of Cape Kidnappers and Kauri Cliffs...

Read More

Woodend School

Woodend School

Brosnan Construction were awarded the contract to construct an 800 square metres 2 storey redevelopment in the growing North Canterbury township of Woodend. The scope for Woodend School included a new two storey eight classroom block. In addition to this, there are some minor weather-tightness repairs for the three remaining buildings. At the completion of the project, the demolition of a two classroom cebus unit will be completed.

Read More

Reefton Area School

Reefton Area School

Refurbishments to school premises always have attendant challenges, due in the main to tight deadlines and the need for the school to continue with its vital role of education whilst the project continues. Add-in a location where high winds are prevalent and that makes for a tough project.

Read More

Takapuna Grammar School, Block N Refurbishment

Takapuna Grammar School, Block N Refurbishment

Projects at educational premises will tend to involve strict workarounds to enable the school to continue to deliver for its pupils during the construction phase or, alternatively, very short timeframes for completion when working during holiday periods. This project had both.

Read More