The foundations of this project were designed to bridge over public storm water and public sewer lines which guaranteed intricacy within the design element alongside proposed complex drainage and limited space on site, the design and specifications were intricate. Due to Brosnan’s thorough programming and methodology, these convolutions within the path of the project were tackled head on in a proactive manner reducing the risk of defects during the project.

Using additional knowledgeable resources, Brosnan was able to contribute to the design element of the project by providing support to their consultant and clarifying design issues. Furthermore, the Brosnan team and their resources continued to work with the client consultants to resolve the issues and subsequently ensure the project was completed with minimal defects, on time and within budget.

PROJECT

Auckland Zoo Small Mammals Holding Facility

TYPE

Commercial,Residential

CLIENT

Regional Facilities Auckland

LOCATION

Auckland

STARTED

January, 2017

COMPLETED

May, 2017

BUDGET

$609,829

Other Projects

Roscommon Road, Wiri

Roscommon Road, Wiri

The Hugh Green Group engaged Brosnan to design and build the post-tension floor at this 14,000 square metre warehouse on Roscommon Road, Wiri.

Read More

Anzac Avenue Apartment Conversion

Anzac Avenue Apartment Conversion

The project involved the conversion, upgrade and refurbishment of an existing c.1920 six storey building into 30 quality apartments. However, the age and condition of the existing structure meant the building required structural improvements and the client’s brief was to bring the building up to 100% of the new building code, involving new foundations, strengthening of existing walls and reinforcing remediation.

Read More

McTiegues Road Stage 5

McTiegues Road Stage 5

The key to this project was the way in which Brosnan Construction worked with their associated trades and supply chain during a short timescale to ensure delivery of this phase of the construction.

Read More

North Shore Hospital

North Shore Hospital

North Shore Hospital Building 5 was constructed in the 1960’s for the purpose of being occupied as staff accommodation. The structure of the building consists of an inadequately filled concrete masonry reinforced exterior cladding with a hollow clay block used as formwork for the 70mm concrete floors. The 2nd story resides of a mix of internal concrete brace walls and structural timber holding the light weight roof. The new purpose of the building is to create a hospital outpatients ward on level zero and offices and teaching facilities on level one and two.