Summerset Karaka Module 103 and 104 Care Apartments

Brosnan has recently completed a contract to deliver the structural element of 2 and 3 storey buildings for 65 residential care apartments, linked to walkways and structural landscaping. The construction involved slab on grade with set downs and services. It had AFS logic walling for the structural internal and exterior walls both of which were also complemented by timber wall framing and trusses. Subsequent floor were constructed by Rib ‘n’ Infill concrete slab methods.

 

Through a collaborative relationship with Summerset, developed over previous projects run for them in Auckland and Canterbury, Brosnan successfully managed this structures package, delivering an excellent outcome for the client.

PROJECT

Summerset Karaka Module 103 and 104 Care Apartments

TYPE

Aged Care,Residential

CLIENT

Summerset Village (Karaka) Ltd.

LOCATION

Karaka, Auckland

STARTED

September, 2015

COMPLETED

November, 2016

BUDGET

$3,500,000

Other Projects

McTiegues Road Stage 5

McTiegues Road Stage 5

The key to this project was the way in which Brosnan Construction worked with their associated trades and supply chain during a short timescale to ensure delivery of this phase of the construction.

Read More

Mon Desir Apartments

Mon Desir Apartments

The ‘leaky home’ issues in New Zealand construction have caused numerous problems for both homeowners and the industry alike. This project typified that situation, with a set of anxious, largely elderly, owners and an initial contractor that went into liquidation during phase one of the project. It was against this backdrop that Brosnan Construction were engaged to complete the contract.

Read More

Residential Repair

Residential Repair

Working with homeowners who have suffered serious damage to their property in the Christchurch earthquakes, Brosnan Construction is contracted through Southern Response to provide repair and rebuild services. An ongoing relationship which, to date, has spanned more than 20 separate projects...

Read More

North Shore Hospital

North Shore Hospital

North Shore Hospital Building 5 was constructed in the 1960’s for the purpose of being occupied as staff accommodation. The structure of the building consists of an inadequately filled concrete masonry reinforced exterior cladding with a hollow clay block used as formwork for the 70mm concrete floors. The 2nd story resides of a mix of internal concrete brace walls and structural timber holding the light weight roof. The new purpose of the building is to create a hospital outpatients ward on level zero and offices and teaching facilities on level one and two.

Read More