Summerset Karaka Module 103 and 104 Care Apartments

Brosnan has recently completed a contract to deliver the structural element of 2 and 3 storey buildings for 65 residential care apartments, linked to walkways and structural landscaping. The construction involved slab on grade with set downs and services. It had AFS logic walling for the structural internal and exterior walls both of which were also complemented by timber wall framing and trusses. Subsequent floor were constructed by Rib ‘n’ Infill concrete slab methods.

 

Through a collaborative relationship with Summerset, developed over previous projects run for them in Auckland and Canterbury, Brosnan successfully managed this structures package, delivering an excellent outcome for the client.

PROJECT

Summerset Karaka Module 103 and 104 Care Apartments

TYPE

Aged Care,Residential

CLIENT

Summerset Village (Karaka) Ltd.

LOCATION

Karaka, Auckland

STARTED

September, 2015

COMPLETED

November, 2016

BUDGET

$3,500,000

Other Projects

Wanaka House

Wanaka House

Building a new home for the owners is always a privilege, but when it’s overlooking the stunning scenery of Lake Wanaka, then it takes on a whole new imperative. Delivering a great place to live was as important as finishing on time and on budget.

Read More

Roscommon Road, Wiri

Roscommon Road, Wiri

The Hugh Green Group engaged Brosnan to design and build the post-tension floor at this 14,000 square metre warehouse on Roscommon Road, Wiri.

Read More

Woodend School

Woodend School

Brosnan Construction were awarded the contract to construct an 800 square metres 2 storey redevelopment in the growing North Canterbury township of Woodend. The scope for Woodend School included a new two storey eight classroom block. In addition to this, there are some minor weather-tightness repairs for the three remaining buildings. At the completion of the project, the demolition of a two classroom cebus unit will be completed.

Read More

Anzac Avenue Apartment Conversion

Anzac Avenue Apartment Conversion

The project involved the conversion, upgrade and refurbishment of an existing c.1920 six storey building into 30 quality apartments. However, the age and condition of the existing structure meant the building required structural improvements and the client’s brief was to bring the building up to 100% of the new building code, involving new foundations, strengthening of existing walls and reinforcing remediation.

Read More