Babbage Office Fitout

Brosnan Construction was awarded this 270m2 fit-out for the new Babbage Consultants office following an open tender process, to provide meeting room and break out spaces together with kitchen facilities.  The interiors specified were a mix of veneer acoustic panelling and glazed partitions with fixed joinery.

The challenge of this project was to ensure the numerous clear-finished veneer Decortech feature ceilings and wall panels were well coordinated with the heavily-serviced ceiling layouts and detailed wall junctions. It was vital to the successful outcome of the project as a whole that the site team prioritised these aspects so as-built dimensions could be provided to suppliers to reduce the risk of errors given the tight project timeframe.

The Brosnan team also recognised that high levels of communication between service and internal glazing trades, as well as suppliers, were going to be key to the project’s success.

PROJECT

Babbage Office Fitout

TYPE

Commercial

CLIENT

Babbage Consultants Ltd

LOCATION

Christchurch

STARTED

November, 2013

COMPLETED

February, 2014

BUDGET

$265,000

Other Projects

North Shore Hospital - Day/Family Room Refurbishments

North Shore Hospital - Day/Family Room Refurbishments

Working in the heart of a live hospital environment always poses a number of challenges. This project involved the refurbishment and modernisation of six family lounge rooms across different levels at the North Shore Hospital and had a short timeframe for delivery, resulting in the Brosnan team having to be highly creative with some of their working solutions.

Read More

Kidicorp - New Build Child Care Centre

Kidicorp - New Build Child Care Centre

Delays sometimes seem to be the byword of construction, but when they are caused by building consent issues, they can put great pressure on the construction team when the finish date is fixed and immovable. Such was the case with this important project in Papakura...

Read More

North Shore Hospital

North Shore Hospital

North Shore Hospital Building 5 was constructed in the 1960’s for the purpose of being occupied as staff accommodation. The structure of the building consists of an inadequately filled concrete masonry reinforced exterior cladding with a hollow clay block used as formwork for the 70mm concrete floors. The 2nd story resides of a mix of internal concrete brace walls and structural timber holding the light weight roof. The new purpose of the building is to create a hospital outpatients ward on level zero and offices and teaching facilities on level one and two.

Read More

Padfield Building Sensory Unit

Padfield Building Sensory Unit

PFR's sensory science unit is an internationally recognised research department that tests both expert and public consumer responses to food and beverage. The scope of this project covered the refurbishing and fit out of L1 of the Padfield Building located at OFR's Mt Albert campus. This included the demolition of existing open plan working areas, offices and some laboratories, and the construction of a new sensory unit and office space. Included in the works is a kitchen area for consumer food preparation, sensory booths, open plan office with meeting rooms and toilet facilities in an area of approximately 700m2.

Read More